Laying From The Door To The Inside For Modular Tile

The size of the garage mat is 400mm*400mm the thickness is 18mm.

The edge size is 400mm*60mm and it is a slope, the ring buckle is the female edge, and the other is the male edge.

Color available of edge is yellow and gray.

The corners are used as accessories. The use frequency is very low, and the available colors are yellow and gray.


Paving scheme 1: fan-shaped scheme

1.Place the first floor tile along the corner. Two sides of the floor tile(without ring buckle) will be directly opposite to both sides of the wall.the outward direction of the two sides with nng buckle to facilitate the fastening of the following floor tiles.

2 keep the two sides with ring buckles outward, extend to the nght and bottom respectively, fan-shaped expansion

3. continue to lay according to the drawing color and according to the above methods, until the completion of the whole workshop, encountered obstacles or walls temporarily placed, to complete the completion, then determine the cutting scheme.


Paving scheme 2: strip laying scheme

1.Place the first floor tile along the corner. Two sides of the floor tile(without ring buckle) will be directly opposite to both sides of the wall.the outward direction of the two sides with ring buckle to facilitate the fastening of the following floor tiles.

2.keep the two sides with ring buckles outward, extend to the nght, linear expansion

3.continue to lay according to the drawing color and according to the above methods, after laying the first row, continue the next row. encountered obstacles or walls temporarily placed, to complete the completion, then determine the cutting scheme


paving scheme 3: laying from the door to the inside

1. Place the first floor tile along the sidewall, the two sides of the floor tile(without ring buckle) face the wall and the doorway, use female edge to fasten the floor tiles on the doorway. Both sides with the ring lock are directed towards the interior of the workshop to facilitate the fastening of the following products.

2. Continue to lay according to the drawing color and according to the above methods, after laying the first row, continue the next row, encountered obstacles or walls temporarily placed, to complete the completion, then determine the cutting scheme.