Talking about the methods of laying the garage floor

First, lay the coiled floor flat on the ground. If the laying distance exceeds 8 meters, the garage floor should be divided into two sections before and after. Then roll up one side of the floor, spread the glue evenly on the rolled up floor, wait until the solvent contained in the glue applied to the floor evaporates to produce viscosity, and then paste it. When pasting, hand the garage floor to the same direction Pushing does not allow air to remain in the floor in the glue.


The volatilization time of the glue varies according to the construction temperature. For example, at a normal temperature of 20 degrees Celsius, the volatilization time of the glue is 30 minutes. . Timely pasting can ensure that the floor has no air bubbles and can not bulge.


Use the same method to paste the other half as well, and use the roller to fully compact the floor and the ground; in this way, the glue and the floor can be more closely bonded together, and the glue rollers are used to roll them in turn. If there are air bubbles, it should be squeezed out with cork or by hand. After cleaning the ground, use a welding torch to weld the weld well 24 hours later.


You Might Also Like

Send Inquiry